Dunlop Tyre Europe GmbH (DTE) said it has entered the final phase of its programme to meet the European Union Deforestation Regulation (EUDR, Regulation (EU) 2023/1115), a regime requiring deforestation-free supply chains.
The obligations apply to large and medium-sized companies from December 30, 2026, and place particular weight on natural rubber used in tyre production, according to DTE. The company, based in Offenbach am Main, Germany, said transparency, traceability and a robust data foundation remain at the core of the regulation.
Commission package clarifies practical application
According to DTE, the simplification package published by the European Commission on May 4, 2026 has further clarified how the regulation will be applied in practice. The company cited reduced administrative effort when sharing due diligence information along the supply chain, together with clearer definitions of roles, responsibilities and digital verification procedures, as the key changes. DTE said it regards these developments as confirmation of the implementation approach it has chosen.
Supply-chain processes and systems in place
The company said EUDR processes have been established across the entire supply chain, and that the scope covers both incoming material and products leaving its operations: the chain it describes runs from import and goods receipt through warehousing to shipment and export. It listed the following completed steps:
- Integration between SAP, the EU information system TRACES, and the logistics and barcode systems has been completed.
- A validation process at goods receipt has been implemented as a key control mechanism.
- Process, data and interface testing across the whole supply chain has been successfully completed.
DTE said Due Diligence Statements (DDS) can now be provided and transferred transparently along the supply chain. In its account, this allows the company to demonstrate EUDR compliance in two capacities — as an importer and as a downstream operator — while drawing on information that upstream supply chain partners have already validated.
Remaining work before the deadline
Between now and December 30, 2026, DTE said it will concentrate on further improving data quality, increasing the automation of verification processes, preparing for audits and widening digital connectivity for customers, including through EDI-Wheel. After the go-live date, the project is expected to move into regular business operations.
The update separates measures described as complete from tasks still ahead. Integration, testing and the goods-receipt validation are presented as finished, while data quality, verification automation and audit preparation are framed as work scheduled for the run-up to the deadline. The statement focuses on process and system readiness rather than on sourcing volumes, supplier counts or cost figures.